Wastewater treatment processes are often thought of to meet effluent standards only. However, novel designs should progress beyond regulation for treatment plants to become factories for the recovery of resources. Depending on the scale of operations and the local needs, economic benefit could be derived from:
Existing infrastructure and old process units are important resources to be reconfigured and upgraded to achieve these goals.
Our process engineers and technologists are experts in the planning, design, construction monitoring and hands-on commissioning of treatment plants, ranging from cutting edge international best practice to the most appropriate local technologies, including:
We use dynamic simulation platforms, checked against our customised spreadsheets, based on the mass balances defined by Activated Sludge Models and Trickling Filter Modules, published by the International Water Association and the South African Water Research Commission.
Drakenstein Local Municipality
New 1.5Mℓ/d treatment plant to meet special limit standards for phosphate and nitrogen, in the sensitive Berg River catchment, through flow balancing in unaerated zones of a Modified UCT process configuration, constructed around an existing clarifier. Waste activated sludge selection improves settleability and phosphate is recovered in an aerobic/anoxic sludge stabilisation reactor.
Newcastle Local Municipality
Upgrade of old extended aeration from 20Mℓ/d to 35Mℓ/d, including biological nutrient removal in a Johannesburg process configuration with return activated sludge to a side-stream anoxic reactor. The plant was upgraded with new inlet works, new clarifier and waste activated sludge thickening, and will include gas chlorination and fine bubble aeration.
Department of Public Works
Repair and upgrade of wastewater treatment plants for a nominal capacity of 1Mℓ/d at rural prisons, including biological trickling filter, with primary sludge withdrawal and anaerobic digestion (Waterval, KZN), and orbal reactors with new paddle aeration and anoxic zones in the Modified Ludzack-Ettinger configuration (Ncome, KZN and Matatshe, Limpopo).
Ekurhuleni Water Care Company
Upgrading of Module 2 and 3 at the Waterval WWCW (1,485m AMSL), from 70Mℓ/d to 110Mℓ/d combined capacity, with biological nutrient removal in a Modified UCT/Three Stage Bardenpho activated sludge process configuration. Replacement of old blowers reduced specific energy demand and improved effluent quality, allowing direct reclamation for drinking water production.
Department of Public Works
Replacement, installation, commissioning and maintenance of the new wastewater treatment plant on Antarctica, with a membrane bioreactor and waste activated sludge centrifuge. The toilets were replaced with a vacuum system to reduce water consumption, because water is produced through an energy intensive ice melting process.