Electro-Mechanical Engineering
ERWAT WATERVAL BLOWER REPLACEMENT
ERWAT WATERVAL BLOWER REPLACEMENT
Engineering processes employ mechanical and chemical operations to transform matter for social benefit. At the core of sustainability, good process design reduces the formation of entropy, which is achieved through:
Virtual Consulting Engineers employs specialist process and mechanical engineers to work on a range of systems from concept to commissioning, operation and maintenance. We are proficient with the interpretation and local application of international design codes, including:
Our computer aided design packages include libraries of symbols and sub-systems that were developed over years, in accordance with:
Department of Public Works / South African Air Force
Condition assessment, compliance audits, hydraulic flow and pressure analysis led to the Repair, Upgrade and Maintenance project that included the rail siding fuel supply system (1,250ℓ/min), two main booster pump stations (2,500ℓ/min) with storage tanks, fighter aircraft revetments, gantry with refuelling points for training aircraft and refuelling pit installations.
Government of St Helena / Basil Read
Conceptualisation and detail design, as per API1540, Design, Construction, etc., of the new St Helena Airport Fuel Facility, that comprised dual function receipt and refuelling pumps with automated flow control, fuel coalescer filter separators, four horizontal epoxy coated storage tanks with capacity of 50m3 each and a complete product recovery system.
Ekurhuleni Water Care Company
Compressors from 1993 were replaced after careful functional and spatial analysis. Five new 400kW aeration compressors (10,896rpm) were designed, manufactured and subjected to ISO 5389: Turbo compressors performance test code. The installation included new electrical supply with Variable Speed Drive starters. Radiators and extractor fans ensure air cooling of the blower house.
Development Bank of Southern Africa / North West Health
Replacement of old boilers at Hospitals with new coal fired boilers at Mahikeng (8.0ton/h), Gelukspan and Wolmaransstad (3.2ton/h), Schweizer-Reneke (1.8ton/h) and refurbishment of boilers at Klerksdorp and Tshepong. Work included installation of feed water softening plants, repair of steam distribution pipes, calorifier installations and condensate return piping.
South African Buro of Standards (SABS)
The SABS main campus was established in 1972 and electro-mechanical services have reached the end of its design life. Tunnels below the buildings house 11km of pipe network that provide mechanical services, including hot-, cold- and chilled water, steam, gas, drinking water and sewage. VCE was appointed for condition assessment and drafted over 900 as-built drawings and electrical line diagrams, for the planning of renovations and upgrades towards energy efficiency.